Sidewalk project to close portion of 32nd St. S.

The City of Great Falls has contracted with United Materials for an ADA sidewalk ramp project.

The construction activity will require a lane closure of 32nd St. S. from 5th Ave. S. to 9th Ave. S. from June 26 to Sept. 23.

During the construction period south bound traffic will be detoured around the construction area.

The contractor will provide barricades, cones and closure signs in the area of construction.

For more information about the 32nd St. S. ADA upgrades project, contact Amanda Brownlee in the city engineer’s office at 406-771-1258.

author avatar
Jenn Rowell